COORDINATES

APPROACH / ENTRANCE CHANNEL

LENGTH : NA

WIDTH : NA

 

DEPTH : 11 M

TURNING BASIN

Not Applicable.

BREAK WATERS

NO BREAK WATER

ANCHORAGES

LATITUDE:160 52. 45' North,LONGITUDE:730 14. 88'' East

GENERAL BERTH RESTRICTION

NO. OF BERTH: One LOA: 170 Meters BEAM: No Restriction
DRAFT: Less than 9 meters

PILOTAGE & NIGHT NAVIGATION

Pilotage is compulsory. No night navigation allowed . Berthing & unberthing has to carried in day light only.

NAVIGATION CHART

Indian Hydrographic Office Charts : 2074 chart applicable; British Admiralty: Not Applicable.

WATER DENSITY

1024-1025 approx.

UNDER KEEL CLEARANCE

1.5 to 2.00 meters

DETAILS OF BUOYS

Not Applicable.

INFRASTRUCTURE & COMMUNICATION

ROAD: Connected with state highways.

RAILS: Nearest railway station - Ratnagiri which is around 30 Kilometers from Finolex terminal

 

AIR: NA

PORT RADIO AND INFO SERVICE : Channel No. VHF working channel 16 / 14

WEATHER CONDITIONS

Port is closed during SW Monsoon Mid May to Mid Sept.

PORT REGULATIONS

ISPS COMPLIANT : Yes Security level is one (1)

DY. PFSO DETAILS

 

PFSO PORT CONTACTS EMAIL
Mr. Mahendra Surve 02352-238027 / 238028 mms@finolexind.com

TIDAL DATA

Not available.

PORT WORKING HOURS

Cargo operation: Port working 24 hrs / 7 days with no holidays.

Except few NATIONAL HOLIDAYS port is operational for entire year.

Cargo operation: Port working 24 hrs / 7 days with no holidays.

 

SHIFT TIME
1ST SHIFT 0700 - 1500 hours
2ND SHIFT 1500 - 2300 hours
3RD SHIFT 2300 - 0700 hours

PORT HEALTH OFFICE

No PHO facility.

MAIN CARGOES

Ethylene , Propylene , Vinyl chloro monomer , EDC ,

REPATRIATION

Not possible. Minor port

FRESH WATER

Not Available

STORE / PROVISIONS :

WORKSHOP

Not Available

BUNKERS

Not Available

GARBAGE DISPOSAL

Not Available

SLOP DISCHARGE

No Facility

CASH TO MASTER

Not Available

BERTHING POLICY/PRIORITY

First come first serve.

PORT NORMS

CARGOS PERFORMANCE-DAY
Ethylene 6720 MT day
Propylene 8000 MT day
Vinyl chloro monomer 6000 MT day
EDC 10800 MT day

BERTH INFORMATION & RESTRICTIONS

MAX Draft to maintain less than 9 Metre, Arrival Displacement limit 20000 Mts, LOA 170 M

BERTH NO. MAX PER. LOA MAX PER. DRAFT MAX PER. BEAM PARALLEL BODY LENGTH DWT DISPLACEMENT FACILITY CARGOES
  IN METERS IN METRIC TONES    
One 170.00 9.00 NA 48.00   20000 Mts limit unloading Arms EDC, Ethylene, VCM

OTHER RESTRICTIONS

Not Available

OTHER FACILITIES

Not Available

CARGO HANDLING EQUIPMENTS

Not Available

MAIN CARGO HANDLING

IMPORT : EDC - Ethylene Dichloride, ETY - Ethylene, VCM - Vinyl Chloride Monomer

WAREHOUSE AND STORAGE

Not Available

LOAD / DISCHARGE FACILITY SPECIFICATION

PARTICULARS SPECIFICATIONS
TYPE OF CONNECTION FROM SHIP'S MANIFOLD TO SHORE PIPELINE single pipeline of 10" connected with chiksan arm of 8" flange weighing 300 LBS & having 12 holes; 8 flange weighing 300 LBS & having 12 holes
NANIFOLD FLANG SIZE 10" & 8" Chickson Arm
MATERIAL OF CONSTRUCTION OF ARM Chikson arm is connected to pipe line.
MATERIAL OF CONSTRUCTION OF DISCHARGE PIPELINE EDC :- Carbon steel, Ethylene/ VCM : Stainless steel
LENGTH OF PIPELINE Ethylene/VCM 900 M from Jetty to tank, EDC from chickson arm booster pump 700 M. ( From Booster pump to tank - 3 km )
LINE SIZE IN MM 200 MM
HOSE SIZE IN MM Not applicable
MAXIMUM PRESSURE IN PIPELINE (KG/CM2) EDC 7.5 Kg/Cm2, ETY 5 Kg / Cm 2, VCM - 10 To 12 Kg.
APPROXIMATELY PRESSURE DROP EDC 6 Kg /Cm 2, ETY /VCM 3.5 Kg / Cm2.
DISHCARGE RATE IN MT / PH EDC- 450 Mts / Hr, ETY 280 Mts/ Hrs, VCM 250 Mts / Hr.
DISTANCE OF TANK FROM BERTH Ethylene/ VCM :- 900 Metre, EDC - 703 Metre.
TANKE CAPACITY / NO. OF TANKS 8 Tanks : EDC 4 tanks, VCM 2 Tanks, Ethylene 2 Tanks,
HEIGHT OF TANKS EDC Tank 20 M, Ety / VCM Tank 17 M,
MATERIAL OF CONSTRUCTION OF TANKS EDC : Carbon Steel , ETY/VCM - Alloy steel
TYPE OF TANSFER FROM TANK TO PLANT Pumping through pipe Line